The first post to the blog is coming on a quiet day where we have made some progress in a few small areas.  We have received 1st draft of the construction drawings from Weiler Engineering and got them printed in 30x40 format from a local firm.  It is a great 1st cut and after a phone call will make a few tweaks and move forward.

We have been in touch with the City of Punta Gorda and should receive the application to install our domestic water meter.  This can be a long process and its good to get it going now.



Comments

Popular posts from this blog